Texas Baptist Home For Children
Data Freshness & Provenance
Inspection coverage
276 inspections on record
Active providers
License status: Open
Last refreshed
April 3, 2026
Latest inspection
March 4, 2026
Provenance
Texas licensing inspections and DaycareCheck scoring
Quick Facts
These facts are normalized from the official record so they can be quoted directly.
Updated April 3, 2026
- Provider
- Texas Baptist Home For Children
- License number
- 197760- 244
- Location
- 629 FARLEY ST, Waxahachie, TX 75165
- Status
- Open
- Safety grade
- F (Poor), score 15.0/100
- Inspection record
- 276 inspections, last inspected March 4, 2026
- Provenance
- Official state licensing inspections and DaycareCheck scoring. Last refreshed April 3, 2026.
Safety Scorecard
92
Total Violations
Mar 4, 2026
Last Inspection
0
Capacity
Violation Timeline
Violations by month over the last 3 years, colored by severity.
All Violations (92)
During a review conducted on October 6, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations..
Resolution: Corrected: 2025-10-07
During a review conducted on October 6, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations..
Resolution: Corrected: 2025-10-07
During a review conducted on October 6, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations..
Resolution: Corrected: 2025-10-07
During a review conducted on October 6, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations..
Resolution: Corrected: 2025-10-07
A caregiver's criminal history and all background check information was not documented and assessed in the home screening.
Resolution: Corrected: 2025-09-29
A caregiver's criminal history and all background check information was not documented and assessed in the home screening.
Resolution: Corrected: 2025-09-29
A caregiver's criminal history and all background check information was not documented and assessed in the home screening.
Resolution: Corrected: 2025-09-29
A caregiver's criminal history and all background check information was not documented and assessed in the home screening.
Resolution: Corrected: 2025-09-29
Several individuals were not inactivated within the required time frame.
Resolution: Corrected: 2025-06-24
Several individuals were not inactivated within the required time frame.
Resolution: Corrected: 2025-06-24
Several individuals were not inactivated within the required time frame.
Resolution: Corrected: 2025-06-24
Several individuals were not inactivated within the required time frame.
Resolution: Corrected: 2025-06-24
During a review conducted on April 3, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2025-04-04
During a review conducted on April 3, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2025-04-04
During a review conducted on April 3, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2025-04-04
During a review conducted on April 3, 2025, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2025-04-04
One caregiver's criminal history was not discussed or assessed in the foster home screening.
Resolution: Corrected: 2025-03-21
One caregiver's criminal history was not discussed or assessed in the foster home screening.
Resolution: Corrected: 2025-03-21
One caregiver's criminal history was not discussed or assessed in the foster home screening.
Resolution: Corrected: 2025-03-21
One caregiver's criminal history was not discussed or assessed in the foster home screening.
Resolution: Corrected: 2025-03-21
The youth's service plan did not include specific information regarding de-escalation methods for the caregivers to use.
Resolution: Corrected: 2025-04-28
It was determined a caregiver repeatedly yelled at a youth in care as a form of discipline.
Resolution: Corrected: 2025-04-28
A caregiver attempted to physically control and intimidate a youth in care when the youth attempted to leave the room.
Resolution: Corrected: 2025-04-28
It was determined a caregiver repeatedly yelled at a youth in care as a form of discipline.
Resolution: Corrected: 2025-04-28
The youth's service plan did not include specific information regarding de-escalation methods for the caregivers to use.
Resolution: Corrected: 2025-04-28
The youth's service plan did not include specific information regarding de-escalation methods for the caregivers to use.
Resolution: Corrected: 2025-04-28
It was determined a caregiver repeatedly yelled at a youth in care as a form of discipline.
Resolution: Corrected: 2025-04-28
A caregiver attempted to physically control and intimidate a youth in care when the youth attempted to leave the room.
Resolution: Corrected: 2025-04-28
The youth's service plan did not include specific information regarding de-escalation methods for the caregivers to use.
Resolution: Corrected: 2025-04-28
It was determined a caregiver repeatedly yelled at a youth in care as a form of discipline.
Resolution: Corrected: 2025-04-28
A caregiver attempted to physically control and intimidate a youth in care when the youth attempted to leave the room.
Resolution: Corrected: 2025-04-28
A caregiver attempted to physically control and intimidate a youth in care when the youth attempted to leave the room.
Resolution: Corrected: 2025-04-28
Medication was observed unlocked on the kitchen counter, on the bathroom counter in the parent's room, and on the night stand in the parent's room.
Resolution: Corrected: 2024-11-18
Medication was observed unlocked on the kitchen counter, on the bathroom counter in the parent's room, and on the night stand in the parent's room.
Resolution: Corrected: 2024-11-18
Medication was observed unlocked on the kitchen counter, on the bathroom counter in the parent's room, and on the night stand in the parent's room.
Resolution: Corrected: 2024-11-18
Medication was observed unlocked on the kitchen counter, on the bathroom counter in the parent's room, and on the night stand in the parent's room.
Resolution: Corrected: 2024-11-18
During a review conducted on October 3, 2024, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2024-10-04
During a review conducted on October 3, 2024, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2024-10-04
During a review conducted on October 3, 2024, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2024-10-04
During a review conducted on October 3, 2024, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2024-10-04
During a review conducted on April 1, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2)12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: -Operation failed to satisfy the conditions of the plan -Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and -Operation was unable to meet compliance with Medium-High or High weighted licensing citations.
Resolution: Corrected: 2024-04-02
During a review conducted on April 1, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2)12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: -Operation failed to satisfy the conditions of the plan -Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and -Operation was unable to meet compliance with Medium-High or High weighted licensing citations.
Resolution: Corrected: 2024-04-02
During a review conducted on April 1, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2)12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: -Operation failed to satisfy the conditions of the plan -Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and -Operation was unable to meet compliance with Medium-High or High weighted licensing citations.
Resolution: Corrected: 2024-04-02
During a review conducted on April 1, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2)12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: -Operation failed to satisfy the conditions of the plan -Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and -Operation was unable to meet compliance with Medium-High or High weighted licensing citations.
Resolution: Corrected: 2024-04-02
A swimming pool area does not have a fence or wall preventing unsupervised access.
Resolution: Corrected: 2024-02-09
A swimming pool area does not have a fence or wall preventing unsupervised access.
Resolution: Corrected: 2024-02-09
A swimming pool area does not have a fence or wall preventing unsupervised access.
Resolution: Corrected: 2024-02-09
A swimming pool area does not have a fence or wall preventing unsupervised access.
Resolution: Corrected: 2024-02-09
The home screening did not address who would be the foster parents support system during unexpected events or crisis.
Resolution: Corrected: 2024-02-22
The home screening did not address who would be the foster parents support system during unexpected events or crisis.
Resolution: Corrected: 2024-02-22
The home screening did not address who would be the foster parents support system during unexpected events or crisis.
Resolution: Corrected: 2024-02-22
The home screening did not address who would be the foster parents support system during unexpected events or crisis.
Resolution: Corrected: 2024-02-22
During a review conducted on September 25, 2023, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2023-09-26
During a review conducted on September 25, 2023, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2023-09-26
During a review conducted on September 25, 2023, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2023-09-26
During a review conducted on September 25, 2023, it was determined that: (1) the Administrator failed to ensure compliance with the current HM Plan; and (2) 12 months had elapsed since the effective date of the plan. The heightened monitoring plan for this operation included a specific ?planned end date? at the 12-month mark by which the operation was expected to meet all heightened monitoring criteria necessary to move out of active heightened monitoring to a phase of ?post plan monitoring?. As a direct result of the administrator?s failure to ensure timely compliance with the heightened monitoring plan, this operation is now unable to successfully move to post-plan monitoring. Furthermore, the operation?s ?planned end date? must now be revised, and the period of heightened monitoring must be extended. Further details of the administrator?s failure to ensure compliance include the following: - Operation failed to satisfy the conditions of the plan - Operation failed to demonstrate 6 months of successive compliance with the standard and contract requirements that led to heightened monitoring; and - Operation was unable to meet compliance with Medium-High or High weighted licensing citations, including having an open investigation.
Resolution: Corrected: 2023-09-26
CPR/First Aid for two foster parents expired on 5/23/2023 and has not been renewed.
Resolution: Corrected: 2023-06-14
CPR/First Aid for two foster parents expired on 5/23/2023 and has not been renewed.
Resolution: Corrected: 2023-06-14
CPR/First Aid for two foster parents expired on 5/23/2023 and has not been renewed.
Resolution: Corrected: 2023-06-14
CPR/First Aid for two foster parents expired on 5/23/2023 and has not been renewed.
Resolution: Corrected: 2023-06-14
During the inspection it was discovered that there was an overnight guest that did not have a completed background check. There is also a babysitter of the children that did not have a background check.
Resolution: Corrected: 2023-01-17
During the inspection it was discovered that there was an overnight guest that did not have a completed background check. There is also a babysitter of the children that did not have a background check.
Resolution: Corrected: 2023-01-17
During the inspection it was discovered that there was an overnight guest that did not have a completed background check. There is also a babysitter of the children that did not have a background check.
Resolution: Corrected: 2023-01-17
During the inspection it was discovered that there was an overnight guest that did not have a completed background check. There is also a babysitter of the children that did not have a background check.
Resolution: Corrected: 2023-01-17
1 of 2 home studies reviewed did not have the date or method for the aduld child's interview.
Resolution: Corrected: 2022-11-21
1 of 2 home studies reviewed did not have the date or method for the aduld child's interview.
Resolution: Corrected: 2022-11-21
1 of 2 home studies reviewed did not have the date or method for the aduld child's interview.
Resolution: Corrected: 2022-11-21
1 of 2 home studies reviewed did not have the date or method for the aduld child's interview.
Resolution: Corrected: 2022-11-21
One of two serious incident reports reviewed did not report to the hotline timely.
Resolution: Corrected: 2022-11-04
One of two serious incident reports reviewed did not report to the hotline timely.
Resolution: Corrected: 2022-11-04
One of two serious incident reports reviewed did not report to the hotline timely.
Resolution: Corrected: 2022-11-04
One of two serious incident reports reviewed did not report to the hotline timely.
Resolution: Corrected: 2022-11-04
The caregiver did not use appropriate discipline with the children in care for an incident that occurred.
Resolution: Corrected: 2022-11-07
The caregiver did not use appropriate discipline with the children in care for an incident that occurred.
Resolution: Corrected: 2022-11-07
The caregiver did not use appropriate discipline with the children in care for an incident that occurred.
Resolution: Corrected: 2022-11-07
The caregiver did not use appropriate discipline with the children in care for an incident that occurred.
Resolution: Corrected: 2022-11-07
Caregivers did not document a serious incident involving a child needing to be rescued by the Coast Guard or report it to the agency.
Resolution: Corrected: 2022-04-25
Caregivers did not document a serious incident involving a child needing to be rescued by the Coast Guard or report it to the agency.
Resolution: Corrected: 2022-04-25
Caregivers did not document a serious incident involving a child needing to be rescued by the Coast Guard or report it to the agency.
Resolution: Corrected: 2022-04-25
Caregivers did not document a serious incident involving a child needing to be rescued by the Coast Guard or report it to the agency.
Resolution: Corrected: 2022-04-25
Of the 14 serious incident reports reviewed, eight had missing information that was not documented in the report.
Resolution: Corrected: 2021-12-03
Of the 14 serious incident reports reviewed, eight had missing information that was not documented in the report.
Resolution: Corrected: 2021-12-03
Of the 14 serious incident reports reviewed, eight had missing information that was not documented in the report.
Resolution: Corrected: 2021-12-03
Of the 14 serious incident reports reviewed, eight had missing information that was not documented in the report.
Resolution: Corrected: 2021-12-03
Two fire extinguishers in the home were due to be serviced in August of 2021.
Resolution: Corrected: 2021-10-11
Medications were stored in locked closet but not in a locked container.
Resolution: Corrected: 2021-09-29
Medications were stored in locked closet but not in a locked container.
Resolution: Corrected: 2021-09-29
Two fire extinguishers in the home were due to be serviced in August of 2021.
Resolution: Corrected: 2021-10-11
Medications were stored in locked closet but not in a locked container.
Resolution: Corrected: 2021-09-29
Two fire extinguishers in the home were due to be serviced in August of 2021.
Resolution: Corrected: 2021-10-11
Medications were stored in locked closet but not in a locked container.
Resolution: Corrected: 2021-09-29
Two fire extinguishers in the home were due to be serviced in August of 2021.
Resolution: Corrected: 2021-10-11
Get Inspection Alerts
Be the first to know when new inspections or violations are reported for Texas Baptist Home For Children.
Nearby Daycares in Waxahachie
Cheryl Jones
109B OLIVE ST
Ya Ya's Yuniversity
323 KIRKSEY ST
Waxahachie ISD Child Care Center
614 N GETZENDANER ST
YMCA @ Jimmie Ray Elementary
250 SARATIGA DR
LaFondas Kids
108 WELLINGTON CT
Frequently Asked Questions
What is Texas Baptist Home For Children's safety grade?
Texas Baptist Home For Children has a safety grade of F (Poor) based on state inspection data. The composite score is 15.0 out of 100.
How many violations does Texas Baptist Home For Children have?
Texas Baptist Home For Children has 92 total violations on record, including 64 critical, 28 serious, and 0 minor.
When was Texas Baptist Home For Children last inspected?
Texas Baptist Home For Children was last inspected on March 4, 2026.