PISD Springhill Elementary Extended Day Program
Data Freshness & Provenance
Inspection coverage
13 inspections on record
Active providers
License status: Open
Last refreshed
May 4, 2026
Latest inspection
April 29, 2026
Provenance
Texas licensing inspections and DaycareCheck scoring
Quick Facts
These facts are normalized from the official record so they can be quoted directly.
Updated May 4, 2026
- Provider
- PISD Springhill Elementary Extended Day Program
- License number
- 1497774
- Location
- 600 S HEATHERWILDE BLVD, Pflugerville, TX 78660
- Status
- Open
- Safety grade
- D (Below Average), score 60.0/100
- Inspection record
- 13 inspections, last inspected April 29, 2026
- Provenance
- Official state licensing inspections and DaycareCheck scoring. Last refreshed May 4, 2026.
Safety Scorecard
Quality Rating
Rated by Texas Rising Star, the state quality rating and improvement system.
48
Total Violations
Apr 29, 2026
Last Inspection
108
Capacity
Violation Timeline
Violations by month over the last 3 years, colored by severity.
All Violations (48)
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not have documentation of the electronic smoke alarm system inspection completed annually.
Resolution: Corrected: 2024-08-30
The operation did not have an inspection report for the electronic carbon monoxide detection system connected to an alarm/smoke detection system.
Resolution: Corrected: 2024-08-30
The operation did not report a change in the site director.
Resolution: Corrected: 2024-08-23
The CEO was not listed as a controlling person for the operation.
Resolution: Corrected: 2024-08-23
Get Inspection Alerts
Be the first to know when new inspections or violations are reported for PISD Springhill Elementary Extended Day Program.
Nearby Daycares in Pflugerville
Cathryn Tremewan
1235 BUNRATTY CIR
Barbara Shipley
17908 SILENT HARBOR LOOP
Erin Green
1208 LIFFEY DR
Tiffany Moran
17300 SILENT HARBOR LOOP
Amanda Slininger
3704 WETLAND DR
Frequently Asked Questions
What is PISD Springhill Elementary Extended Day Program's safety grade?
PISD Springhill Elementary Extended Day Program has a safety grade of D (Below Average) based on state inspection data. The composite score is 60.0 out of 100.
How many violations does PISD Springhill Elementary Extended Day Program have?
PISD Springhill Elementary Extended Day Program has 48 total violations on record, including 48 critical, 0 serious, and 0 minor.
When was PISD Springhill Elementary Extended Day Program last inspected?
PISD Springhill Elementary Extended Day Program was last inspected on April 29, 2026.